this post was submitted on 30 Aug 2023
577 points (90.7% liked)

World News

38553 readers
3432 users here now

A community for discussing events around the World

Rules:

We ask that the users report any comment or post that violate the rules, to use critical thinking when reading, posting or commenting. Users that post off-topic spam, advocate violence, have multiple comments or posts removed, weaponize reports or violate the code of conduct will be banned.

All posts and comments will be reviewed on a case-by-case basis. This means that some content that violates the rules may be allowed, while other content that does not violate the rules may be removed. The moderators retain the right to remove any content and ban users.


Lemmy World Partners

News [email protected]

Politics [email protected]

World Politics [email protected]


Recommendations

For Firefox users, there is media bias / propaganda / fact check plugin.

https://addons.mozilla.org/en-US/firefox/addon/media-bias-fact-check/

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 1 points 1 year ago (1 children)

The best time to build them was decades ago, so clearly the second best time is to… Never? Your argument is taken straight from the oil and coal industries – it would take too long to build up renewables infrastructure, so let’s just not do it? We shouldn’t build windmills, because you can’t tell me how many we need globally?

You seem to be unaware of the plans and needs to reduce GHGs. We do not have decades to waste.

[–] [email protected] 1 points 1 year ago

You're right, and that's why it would be foolish to build exclusively nuclear. It's also foolish however to not build any nuclear. The long lead time means we need to start ASAP so it's ready ASAP. With proper government action targeting bottlenecks in the process (I believe there's only one manufacturer in the world for a certain type of reactor shielding) we can speed that up.

Diversification is the way to go. At the very least, we should build enough reactors and breeder reactors to consume existing nuclear waste and drive that to effectively 0.

On top of all that, the bottleneck for deploying solar and wind en masse isn't actually solar and wind facilities (although we certainly need those) but our electric grid. It needs an upgrade in order to integrate alternative energies, and I believe estimates on doing that are ~10 years. We might end up in a situation where a nuclear reactor is actually faster to build, depending on the type.